Wednesday, April 11, 2007 |
INSTALLER SET ONE OF THE DECK ONTO JACKET |
|
posted by Eko Setiadi @ 12:55 AM |
|
|
Monday, February 12, 2007 |
2 DECK TELAH DIATAS BARGE SIAP DITOWING |
|
posted by Eko Setiadi @ 7:12 PM |
|
|
|
1 DECK TELAH DI ATAS BARGE |
|
posted by Eko Setiadi @ 7:09 PM |
|
|
Friday, January 26, 2007 |
TOP SIDES -DECKS almost ready |
|
posted by Eko Setiadi @ 6:02 PM |
|
|
Wednesday, January 03, 2007 |
JACKET - installed, Legs and Conductors piled |
|
posted by Eko Setiadi @ 5:06 PM |
|
|
|
|
INSTALLING JACKET |
posted by Eko Setiadi @ 5:01 PM |
|
|
Sunday, October 15, 2006 |
ON THE BARGE, BEING PREPARED FOR SAIL AWAY |
|
posted by Eko Setiadi @ 9:22 PM |
|
|
|
LOAD OUT, Jacket in transition, skidding onto the barge |
|
posted by Eko Setiadi @ 9:14 PM |
|
|
Wednesday, October 04, 2006 |
Two Jackets almost completed and being prepared for load out |
|
posted by Eko Setiadi @ 5:48 PM |
|
|
Thursday, September 21, 2006 |
SHACKLES 900 T FOR JACKET LIFTING |
|
posted by Eko Setiadi @ 8:43 PM |
|
|
|
At VRA Mezzanine Deck |
|
posted by Eko Setiadi @ 8:35 PM |
|
|
|
Installing Tech.-Bldg - Control Room |
|
posted by Eko Setiadi @ 8:12 PM |
|
|
|
|
About Me |
Name:Eko Setiadi
Home:
About Me:
See my complete profile
|
Previous Post |
|
Archives |
|
Shoutbox |
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Duis ligula lorem, consequat eget, tristique nec, auctor quis, purus. Vivamus ut sem. Fusce aliquam nunc vitae purus. |
Links |
- link 1
- link 2
- link 3
- link 4
|
Powered by |
|
|