| Wednesday, April 11, 2007 |
| INSTALLER SET ONE OF THE DECK ONTO JACKET |

|
posted by Eko Setiadi @ 12:55 AM  |
|
|
|
| Monday, February 12, 2007 |
| 2 DECK TELAH DIATAS BARGE SIAP DITOWING |

|
posted by Eko Setiadi @ 7:12 PM  |
|
|
|
|
| 1 DECK TELAH DI ATAS BARGE |

|
posted by Eko Setiadi @ 7:09 PM  |
|
|
|
| Friday, January 26, 2007 |
| TOP SIDES -DECKS almost ready |

|
posted by Eko Setiadi @ 6:02 PM  |
|
|
|
| Wednesday, January 03, 2007 |
| JACKET - installed, Legs and Conductors piled |
 |
posted by Eko Setiadi @ 5:06 PM  |
|
|
|
|
|
 INSTALLING JACKET |
posted by Eko Setiadi @ 5:01 PM  |
|
|
|
| Sunday, October 15, 2006 |
| ON THE BARGE, BEING PREPARED FOR SAIL AWAY |
 |
posted by Eko Setiadi @ 9:22 PM  |
|
|
|
|
| LOAD OUT, Jacket in transition, skidding onto the barge |
 |
posted by Eko Setiadi @ 9:14 PM  |
|
|
|
| Wednesday, October 04, 2006 |
| Two Jackets almost completed and being prepared for load out |
 |
posted by Eko Setiadi @ 5:48 PM  |
|
|
|
| Thursday, September 21, 2006 |
| SHACKLES 900 T FOR JACKET LIFTING |
 |
posted by Eko Setiadi @ 8:43 PM  |
|
|
|
|
| At VRA Mezzanine Deck |
 |
posted by Eko Setiadi @ 8:35 PM  |
|
|
|
|
| Installing Tech.-Bldg - Control Room |
 |
posted by Eko Setiadi @ 8:12 PM  |
|
|
|
|
|
| About Me |
|

Name:Eko Setiadi
Home:
About Me:
See my complete profile
|
| Previous Post |
|
| Archives |
|
|
| Shoutbox |
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Duis ligula lorem, consequat eget, tristique nec, auctor quis, purus. Vivamus ut sem. Fusce aliquam nunc vitae purus. |
| Links |
- link 1
- link 2
- link 3
- link 4
|
| Powered by |
 |
|